Oder River

Staff gauges on the Różanka Weir in Wrocław

Set of stainless steel staff gauges mounted on the control building and piers of the Różanka Weir in Wrocław, featuring direct water surface elevation graduation.

Control building and footbridge of the Różanka Weir in Wrocław with a multi-metre stainless steel staff gauge mounted on the corner wall.
Control building and footbridge of the Różanka Weir in Wrocław with a multi-metre stainless steel staff gauge mounted on the corner wall.
Close-up of the stainless steel staff gauge at the Różanka Weir showing the modular interlocking joint and direct elevation graduation (115.0 m a.s.l.).
Close-up of the stainless steel staff gauge at the Różanka Weir showing the modular interlocking joint and direct elevation graduation (115.0 m a.s.l.).

Applied Solution

« Back to all projects